Schedule of the Remote-Sensing Windows, as well as the assigned planners
Window # | LTP # | SOWG # | SOWG Dates | Science/Target | Windows Date | Planners names/details |
---|---|---|---|---|---|---|
Star Calibration campaign |
LTP1 (Jan-Jun 2020) |
14 |
July 2019 |
Coordinated Star Calibration campaign between Metis, EUI/HRI and SPICE, featuring alpha Leo. The S/C will be pointed at the limb around the time of the star's ingress and egress. EUI/HRI will observe at both positions, SPICE only at the latter. |
2020-06-16T05:00:00 - 2020-06-17T23:00:00 |
RAL
|
RSCW 1 |
LTP1 (Jan-Jun 2020) |
14 |
July 2019 |
1st opportunity for RS payload to characterise and calibrate the instruments. Limb Pointing RS-Alignment campaign, involving limb pointings to N,S,E,W + disc centre. The whole campaign takes 8,75 hours, driven SPICE durations of full scans (100mins). |
2020-06-20T05:00:00 - 2020-06-21T00:50:00 |
RAL |
No RSCW |
LTP 2 (July-Dec 2020) |
15 |
30-31 March 2020 |
N/A |
N/A |
N/A |
RSCW 2 |
LTP 3 (Jan-Jun 2021) |
16 |
6-8 July 2020 |
2nd opportunity for RS payload to characterise and calibrate the instruments. RSCW2: 5-day window of RS instrument specific characterisation and calibration campaigns (warm checkout) |
2021-02-21T10:15:00 - 2021-02-25T00:00:00 |
RAL (Coach)
MPS (Trainee) (Luca Teriaca, teriaca@mps.mpg.de) |
RSCW 3 |
LTP 3 (Jan-Jun 2021) |
16 |
6-8 July 2020 |
3rd opportunity for RS payload to characterise and calibrate the instruments. RSCW3: 3-day window of RS instrument specific characterisation and calibration campaigns (extra-cold checkout), no coordinated activities.
|
2021-03-21T00:00:00 - 2021-03-24T00:00:00 |
RAL (Coach)
MPS (Trainee) (Luca Teriaca, teriaca@mps.mpg.de) |
Star Calibration campaign |
LTP 3 (Jan-Jun 2021) |
16 |
6-8 July 2020 |
Coordinated Star Calibration campaign (context in TN-0037) between Metis, EUI/HRI, SPICE and PHI/FDT, featuring sigma sgr. |
2021-03-27T00:00:00 - 2021-03-27T02:00:00 |
RAL (Coach)
MPS (Trainee) (Luca Teriaca, teriaca@mps.mpg.de) |
RSCW 4 |
LTP 4 (July-Dec 2021) |
17 |
January 2021 |
RSCW4: 4th opportunity for RS payload to characterise and calibrate the instruments. Limb Pointing RS-Alignment campaign, involving limb pointings to N,S,E,W + disc centre. The whole campaign takes about 8 hours, based on SPICE durations of full scans. RS+IS SOOP to try out first coordinated science campaign, incl. VSTP cycle. L_SMALL_HRES_HCAD_SlowWindConnection SOOP scheduled from 26 to 29 Sep 2021. |
2021-09-22T02:30:00 - 2021-09-30T00:00:00 |
MPS (Coach) (Luca Teriaca, teriaca@mps.mpg.de)
IAS (Trainee) |
NMP Segment 1, LTP 5, RSW 1,2,3 |
LTP 5 (Jan-Jun 2022) |
18 |
July 2021 |
TBD |
TBD |
TBD |
NMP Segment 1, LTP 6, RSW 1,2,3 |
LTP 6 (July-Dec 2022) |
19 |
January 2022 |
TBD |
TBD |
TBD |
NMP Segment 2, LTP 7, RSW 1,2,3 |
LTP 7 (Jan-Jun 2023) |
20 |
July 2022 |
TBD |
TBD |
TBD |
NMP Segment 2, LTP 8, RSW 1,2,3 |
LTP 8 (July-Dec 2023) |
21 |
January 2023 |
TBD |
TBD |
TBD |
NMP Segment 3, LTP 9, RSW 1,2,3 |
LTP 9 (Jan-Jun 2024) |
22 |
July 2023 |
TBD |
TBD |
TBD |
NMP Segment 3, LTP 10, RSW 1,2,3 |
LTP 10 (July-Dec 2024) |
23 |
January 2024 |
TBD |
TBD |
TBD |
NMP Segment 4, LTP 11, RSW 1,2,3 |
LTP 11 (Jan-Jun 2025) |
24 |
July 2023 |
TBD |
TBD |
TBD |
NMP Segment 4, LTP 12, RSW 1,2,3 |
LTP 12 (July-Dec 2025) |
25 |
January 2025 |
Example: 5 days PolarScience, offpointing (RSW 1), 15 days Pole-to-Pole, disk centre (RSW 1+2), 10 days SlowWindConnection, feature tracking (RSW 3) |
TBD |
TBD |
|
|
|
|
|
|
|